دليل · 5 دقائق قراءة

تحضير العينات للمجهر الإلكتروني الماسح

التثبيت والتأريض وتجنب الشحن الكهربائي، مع نصائح للمساحيق والمقاطع العرضية والتخزين.

المواصفات الفنية والمقالات التقنية متوفرة باللغة الإنجليزية.

A well-prepared sample is stable, conductive to ground and clean. Most poor SEM images trace back to one of these three.

1. Choose the mount

Check which holder your instrument uses: pin-type stubs (3.2 mm pin) fit most SEM and FIB stages; some instruments use cylinder or threaded mounts. Use pre-tilted 45° or 90° stubs for cross-sections and edges.

2. Fix the sample

  • Carbon tabs or tape for most samples: quick, conductive and EDS-friendly.
  • Copper or aluminium tape to make a grounding path from the top surface of a larger sample to the stub.
  • Silver or carbon paint to bridge thick or porous samples; let it dry fully before pumping down.

3. Avoid charging

Insulating samples charge and the image drifts or glows. Options: lower the accelerating voltage, use low-vacuum mode if your instrument has it, add a conductive path with tape or paint, or sputter a thin carbon or metal coating.

Powders and particles

Sprinkle a small amount on a carbon tab, tap the stub on its side, and blow off loose material with dry nitrogen so it cannot contaminate the chamber.

Storage

Store prepared stubs upright in stub boxes, labelled, and in a desiccator for moisture-sensitive samples.

See SEM stubs, adhesives and storage.

غير متأكد من التكوين الذي تحتاجه؟

أخبرنا عن عمليتك أو جهازك أو تجربتك، وسيوصي لك أخصائي مواد بالركيزة أو الدرجة أو الأداة المناسبة ويقدم لك عرض سعر.

تحدث إلى خبير